The valve maintenance equipment main equipment equipment is as follows:
1. must the equipment: the engine bed - model needs to look services the valve size specification decides in the choice model, the main factory Shenyang first engine bed, Mudanjiang engine bed, Yunnan engine bed, Lanxi engine bed, and so on.
2. supporting facility: the drilling machine - bench drill - rocking shaft drills The factory is quite many may compare in the choice.
3. checker: the valve hydrostatic testing equipment - grinder, the general flange connection gate valve, the cut-off valve, the ball valve, the check valve select the JWZ valve test platform, the reed valve select the JLD reed valve test platform, welds the valve to select JWT to go against pressure test Taiwan, the
4. paint and the packing: repairs the good valve to be possible to have the user need and the request height processes the paint craft and the packing rank, satisfies the customer situation to decide
5. to need the technical personnel: necessary specialized valve production practical experience and understanding valve structure principle engineer above 1, the skilled lathe worker, the driller, examine inspect a work project, painter each 1-3 person of